?? 国产成人av一区二区三区在线观看,里番精品3d一二三区,99re

欧美中文字幕-麻豆入口-在线观看一级片-国语对白对话在线观看-久久久性-91伊人网-免费在线观看黄色片-国产一级二级视频-在线中文字幕观看-91官网在线观看-成人亚洲精品777777ww-色中文-av看片资源-亚洲最大成人在线-懂色av一区二区三区蜜臀-20日本xxxxxxxxx46-诱夫1v1高h-国产精品久久久久久久久免费相片-av一级免费-少妇姐姐

Back to top

首頁 ? Use of communication ? Matters to note before installing a Roots fan

Matters to note before installing a Roots fan

In order to ensure the quality of the installation and improve the efficiency of the installation work, it is necessary to do a good job of all the preparatory work before installation.

  1. Familiarize yourself with the design drawings, information, manuals and other technical documents for the installation of Roots fans. Including familiar with the installation drawings of the ventilator body, grasp the structural characteristics of the ventilator; familiar with the ventilation system drawings of the ventilator, understand the working condition of the ventilator in the system; familiar with the acceptance specification of the foundation of the ventilator and its construction, according to the design drawings to check the specification of the ventilator, the form of the rotating direction of the blades or the rotor, the power requirements of the prime mover, the center of the ground bolts holes, the diameter and orientation and the center distance of the flanges of the inlet and outlet, and the center elevation of the main shaft, etc. whether it meets the requirements of the design. The center distance of foot bolt holes, the diameter and center distance of air inlet and outlet flanges, and the center elevation of the main shaft are in accordance with the design requirements.
  2. According to the product packing list inventory ventilator accessories, accessories, parts of the specifications, quantity, and then the appearance of the inspection. For example, whether the shell has corrosion, dirt, whether the rotor has deformation and scars, and so on.
  3. Problems identified during the inspection, including design, machine, and construction problems, should be resolved immediately or the installation work cannot proceed.
  4. Checklist, should be responsible for the custody of a person, small parts with the original boxed for safekeeping, ventilators, electric motors should be set up canopy, the bottom of the product is set up cushion wood, to prevent the product in the open air to prevent or sink in the mud and water.
  5. Note that the above should be carried out in conjunction with the authority responsible for the supply of equipment and a detailed record of the checks and verifications should be kept.

Learn more about Roots fans please:https://csroots.cn

13755181118